MOS / Modules / Workforce
Available

Skill Matrix

Who can run which station — and where the line is exposed.

Request a POCSee the screen
Skill Matrix screen 1 in MOS
The screen

What it looks like in MOS

Every operator against every station on a 0–4 scale, coverage per shift against what each station needs, and the next people to train so no station depends on one person.

Download the one-pagerRequest a POC
What it does

In plain words

Every operator against every station on a 0–4 scale, coverage per shift against what each station needs, and the next people to train so no station depends on one person.

What it does for you
  • Operator × station matrix on a 0–4 scale
  • Coverage per shift
  • Gaps against each station's need
  • Who to train next
  • Linked to DOJO certification
  • Linked to operator verification

What it connects to

  • HR master
  • DOJO results

Where it runs today

Available as a module on the MOS platform, configured to your stations and people during installation.

How it works

From the shop floor to the screen, in four steps

List

Operators and stations are listed with what each station needs.

Rate

Each operator is rated 0–4 at each station.

See coverage

MOS shows, per shift, which stations are covered and which depend on one person.

Plan

The next people to train are suggested and linked to DOJO.

The screens

What you see in MOS

  1. Operator × station matrix
  2. Coverage and gaps
  3. Operators
  4. Training plan
The numbers

What it measures for you

Stations covered per shiftOperators per levelTraining gaps

Every figure comes from the machine, the camera or the station itself — recorded as it happens, not typed in at the end of the shift.

Who uses it

Everyone sees what their job needs

Supervisor

Who can run which station today

HR / training

Who to train next

Plant head

Where the line is exposed

On site

What is needed in your plant

To start

The list of operators and stations.

Ratings

Supervisors rate each operator once; DOJO results keep it current.

In the plant

The MOS plant server.

Rollout

From the first day to the first month

Day one

Matrix built

Operators and stations listed with what each needs.

Week one

Ratings in

Every operator rated at every station.

Month one

Coverage planned

Gaps per shift and a training plan linked to DOJO.

Questions

Asked about Skill Matrix

Who keeps it current?

DOJO certification and supervisor updates; every change is dated.

Does it link to face verification?

Yes — a stage can require an operator certified for it.

Works with

The rest of MOS

Request a POC

See it on your own machine.

Tell us about your plant and what you want to see. We visit, connect one machine or station, and you watch your own data in MOS before anything is quoted.

  • A plant visit to see the line and the problem
  • One machine or station connected as a proof of concept
  • Your own data, live, on MOS screens
  • Scope, modules and timeline agreed in writing only after that
Thank you — request received.We will call you shortly to plan the visit.