MOS · The New Standard of Production.
Digiryze Pro · contact@digiryze.com · +91 72890 30816
Skill MatrixAvailable
Who can run which station — and where the line is exposed.
Every operator against every station on a 0–4 scale, coverage per shift against what each station needs, and the next people to train so no station depends on one person.
What it does for you
- Operator × station matrix on a 0–4 scale
- Coverage per shift
- Gaps against each station's need
- Who to train next
- Linked to DOJO certification
- Linked to operator verification
What it connects to
What it measures
- Stations covered per shift
- Operators per level
- Training gaps
How it works
ListOperators and stations are listed with what each station needs.
RateEach operator is rated 0–4 at each station.
See coverageMOS shows, per shift, which stations are covered and which depend on one person.
PlanThe next people to train are suggested and linked to DOJO.
Needed in your plant
- To start — The list of operators and stations.
- Ratings — Supervisors rate each operator once; DOJO results keep it current.
- In the plant — The MOS plant server.
Where it runs today
- Available as a module on the MOS platform, configured to your stations and people during installation.