MOS / Modules / Workforce
SKILL MATRIX BY MOS
Available

Skill Matrix

Who can run which station — and where the line is exposed.

0–4 per stationCoverage per shiftGaps flaggedWho to trainLinked to DOJO
See it on my machineSee the screen
Product UI showcase

The real screens, not a mock-up

Captures of MOS as it runs — what your supervisor, packer, dispatcher and head office actually see.

mos · skill matrix
Skill Matrix — Matrix
Operator × station

Matrix

Every operator rated 0–4 at every station, in one grid.

  • 0–4 scale per station
  • Coverage at a glance
  • Single points of failure visible
See it on my machine
Product positioning

One person away and a station stops

Nobody wrote down that only one operator can run that station until he was on leave.

“Every operator against every station on a 0–4 scale, coverage per shift, gaps, and the next people to train — linked to DOJO.”
Today
Training fileShift rosterStation coverExposurefound when it fails
With Skill Matrix
Skill matrixCover per shiftGapPlannedexposure known per shift

Drawn, not promised: the top row is a training file and a roster that do not meet until a station runs without a trained operator. The bottom row is the matrix against the stations, so the gap on a shift is known before the shift.

End-to-end flow

5 connected stages

Hover or tap a stage to see what is captured there.

01

List

Operators & stations
  • What each station needs
  • Operators per shift
  • Once
02

Rate

0–4
  • By the supervisor
  • Per station
  • Dated
03

See

Coverage
  • Per shift
  • Single points of failure
  • Gaps vs need
04

Plan

Who to train
  • Next trainees
  • Linked to DOJO
  • Re-certification
05

Keep current

Automatically
  • DOJO results update ratings
  • Supervisor changes dated
  • Face verification uses it
Continuous threadList→Rate→See→Plan→Keep current
Part of the platform

Skill Matrix runs on MOS

Not a standalone tool — a product on the MOS platform, sharing one login, one set of people and roles, and one database with every other module. The lit layers are the ones this product uses; the signal path shows how data moves through them.

  • MOS Edge runs inside the plant — interlocks and screens keep working if the internet does not.
  • MOS Central is a one-way mirror for head office and every plant in one view.
  • Your IT never opens an inbound port.
MOS CentralEvery plant, one view
MOS EdgeYour plant server
MOS CoreThe operating layerin use
MOS ConnectMachine connectivity
MOS VisionAI on the line
Core engine & extensions

What is core, what extends it, what is not claimed yet

The honest map, drawn as one thread. Filled nodes are in the product today; outlined nodes are other MOS modules on the same platform; dotted nodes are roadmap and never represented as available until built. Hover a node.

● Core

● Core — in the product today○ Extension — another MOS module◌ Roadmap — not claimed
Native engine

Core functionalities

Each card ends with the thing itself as it appears in MOS — not a description of it.

Rate

Simple

  • 0–4 per station
  • By the supervisor
  • Dated changes
  • Linked to DOJO results
See

At a glance

  • Operator × station grid
  • Coverage per shift
  • Gaps against need
  • Single points of failure
Plan

What to do next

  • Who to train for which station
  • Re-certification due
  • Trainer view
  • Feeds DOJO batches
Use

Across MOS

  • Face verification checks it
  • DOJO updates it
  • HR employee master
  • Per plant
Operational journey

6-step digital thread

Step through it or let it play. Each step: who does it, on what, what is captured, and the check that guards it.

Step 1 / 6
Step 1 · Setup

List

Operators and stations are listed with what each station needs per shift.

WhereSetup
CapturedOperators, stations, needs
Guard / interlock—
● live in MOS
Where it sits

Your ERP or Tally runs the books. This adds the ground truth.

Your ERP / Tally typically givesSkill Matrix adds
Skills known in the supervisor's headA dated 0–4 matrix for every operator
Found out when someone is on leaveSingle points of failure flagged in advance
Training by availabilityTraining by the gaps that matter
A list that goes staleUpdated by DOJO certification
Hardware & connectivity

Works with what a plant already has

To start

The operator and station list

Ratings

Supervisors rate once; DOJO keeps it current

Server

MOS Core on the plant server

Nothing else

No device, no sensor

At a glance

The spec

What it connects to, where it runs and what it gives you — the short version your IT and your plant head both want.

ReadsHR master, DOJO results
Runs onMOS Core
Needs on siteThe operator and station list
OutputsOperator×station matrix, coverage per shift, gaps, training plan
Licensed byPer plant
Capability transparency

What is built, what extends, what is not claimed

Core — today

Matrix, coverage per shift, gaps, training plan.

Extension

DOJO certification and operator verification on the same platform.

Integration-dependent

None.

Roadmap

Skill-based auto-rostering — not represented as available.

Capabilities depend on the plant's process and what is connected at site. Nothing on this page is represented as available until it is built and running.

What you get

5 outcomes

0–4 per operator per station Coverage per shift Single points of failure flagged Who to train next Linked to DOJO
Who uses it

Everyone sees what their job needs

Supervisor

Who can run which station today

HR / training

Who to train next

Plant head

Where the line is exposed

On site

What is needed in your plant

To start

The list of operators and stations.

Ratings

Supervisors rate each operator once; DOJO results keep it current.

In the plant

The MOS plant server.

Rollout

From the first day to the first month

Day one

Matrix built

Operators and stations listed with what each needs.

Week one

Ratings in

Every operator rated at every station.

Month one

Coverage planned

Gaps per shift and a training plan linked to DOJO.

Questions

Asked about Skill Matrix

Who keeps it current?

DOJO certification and supervisor updates; every change is dated.

Does it link to face verification?

Yes — a stage can require an operator certified for it.

Works with

The rest of MOS

On your own machine

See it on your own machine.

Tell us about your plant and what you want to see. We visit, connect one machine or station, and you watch your own data in MOS before anything is quoted.

  • A plant visit to see the line and the problem
  • One machine or station connected as a proof of concept
  • Your own data, live, on MOS screens
  • Scope, modules and timeline agreed in writing only after that
Thank you — request received.We will call you shortly to plan the visit.