MOS · The New Standard of Production.
Digiryze Pro · contact@digiryze.com · +91 72890 30816

MES & TraceabilityRunning in production

Every unit scanned at every station. Nothing skips a stage.

Each unit carries a serial. At every station MOS checks that the unit passed every stage before it, that the parts fitted match the bill of materials, and that the test results are within limits — and only then lets the line move on. Labels print at the right station, quality holds stop a batch on the spot, and every unit keeps its full history from first station to the truck.

What it does for you

  • Work orders and model masters — BOM, routing, test limits, label format — released to every station in seconds
  • Stage interlock: a unit that skipped or failed a stage is stopped, with the reason
  • BOM serial checks on every critical part
  • Test results read from leak, vacuum and run-test benches
  • Label printing at the right station
  • Quality hold and release
  • Full genealogy and dispatch, searchable by serial

What it connects to

  • Scanners and station PCs
  • Test benches over Modbus or their own databases
  • Label printers
  • The plant ERP, at the dispatch step

What it measures

  • First-pass yield per station
  • Units by stage, hour and shift
  • Interlock stops and their reasons
  • Test pass / fail by bench
  • Full genealogy per serial

How it works

Model the lineStations, their order, the parts fitted at each and the tests each must pass are set up once; a planner releases a work order and every station gets the model's masters.
Scan at every stationThe unit serial is scanned; MOS checks it passed every earlier stage and fits the right parts.
Read the testsLeak, vacuum, hi-pot and run-test results are read from the benches — not typed.
Release or holdOnly a unit that passed everything gets its label and moves on; a quality hold stops a batch at once.

Needed in your plant

  • At each station — A scanner, and a screen or tablet for the go / no-go.
  • At test benches — The bench result read over its network or from its files.
  • In the plant — The MOS plant server and label printers where labels are applied.

Where it runs today

  • Room-AC indoor and outdoor unit lines — 20+ station apps with interlocks, leak and vacuum tests, labels and unit matching
  • Two-wheeler final inspection — every vehicle traced by its VIN across five test stations
The proof of concept on one machine comes before any quotation.digiryze.com/mos